Sod Barrie, Ontario
This job was very labour intensive as all river rock was to be excavated by hand and loaded into a 14 yard bin keeping river rock separate from all dirt and debris. After river rock was excavated, 3 inches of compost was added and sod was installed with spikes to prevent erosion.