top of page

Sod Barrie, Ontario

This job was very labour intensive as all river rock was to be excavated by hand and loaded into a 14 yard bin keeping river rock separate from all dirt and debris. After river rock was excavated, 3 inches of compost was added and sod was installed with spikes to prevent erosion.

Featured Posts
Check back soon
Once posts are published, you’ll see them here.
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page